SLP wastewater treatment plant
CLIENT:
Comisión Estatal del Agua Estatal / Banobras / Degrémont
LOCATION:
San Luis Potosí
SCOPE:
110 hectares of storage area for the Tenorio tank. 20 km of collectors divided into 6 branches. Treatment plant with an average flow capacity of 1,050 liters per second. 115 KVA transmission line. 40 km conveyance line. Irrigation system. Water treatment at 1,050 liters/sec. Project Coordination and review.