NAICM (Texcoco Airport)Airside Engineering Project for the Texcoco Airport, which was planned to obtain a LEED certification
Cancun International Airport Control TowerTechnical, Administrative Supervision and Quality Control Services of the Work
Glass PlantEngineering project for 9 batteries of concrete silos in a glass plant that supplies bottles for bottling beer from Cervecería Cuauhtémoc Moctezuma.
HONDA PLANTDue diligence, civil engineering and complete construction management for its construction.
BMW PLANTEngineering and architectural services for the expansion of the facilities and for the construction of the TEM Building for the manufacture of batteries used for electric vehicles.
Malecon Americas CancunDetailed engineering for the electrical, hydraulic and sanitary installations, fire control systems and voice and data routing.
Mexico City MetrobusSupervision on lineas 3, 5, 6 and 7 of the Mexico City Public Transportation System.
Interoceanic Corridor of the Isthmus of TehuantepecProject Management and Supervision Office of more than 1,200 kilometers of roads.
Interurban High Speed Train Mexico – Valley of MexicoSupervision of the construction and complementary works of Section 3 of the Elevated Viaduct
El Cuchillo AqueductIndependent engineer service during the manufacturing process of steel pipe and pumping equipment, as well as release in the right of way for installation.
Tenorio Treatment PlantEngineering for the Treatment Plant with average flow capacity of 1,050.00 liters per second.
Desalination PlantEngineering for a desalinated seawater production plant for human consumption. 200 lt/sec.
Atotonilco Water Treatment PlantDevelopment of the electrical, mechanical and instrumentation and control engineering project
Istmeño Wind Project“Owner engineer” field studies for the largest wind project in Latin America (132 generators)
Acapulco General HospitalIntegral Project for the construction of the general hospital in Acapulco with 120 beds.
Punta Reforma TowerDevelopment of the integral engineering project under the Green Building standards.
Dos Bocas RefineryDetailed engineering services for Phase II (OBCE), scope of package No. 6, project in execution, and integral engineering services for the systems through the use of the Smart Plant platform in MEBI and METI models.
Altamira Maritime TerminalSupervision and quality control for the expansion of the existing dock in the multi-use cargo terminal.
Maritime Customs of the Port of VeracruzDirection of the corresponding works, coordination of initiation, execution, completion and approval by the client.
Sky Santa FeCoordination and Supervision of the works of a project for 2 apartment towers, Oriente A and B Towers
El Chopo University MuseumSupervision of the works consisting of the Executive Project of installations and construction of the architectural superstructure of recovery and expansion.
ON-SHORE GAS PIPELINESClass V cost estimate for the project of a future gas pipeline of approximately 200 km.
ON-SHORE PIPELINES"Cactus" measurement, regulation and control station of the Cuxtal Phase I project, development of dimensional analysis of EMRyC and development of hydraulic model, flexibility analysis, model calibration and development of the hydraulic analysis.
Nivea plantDevelopment of engineering for the expansion of 25,000 m2 of an industrial plant that manufactures cosmetic products.
San Julián MineExecutive project for the construction of the grinding, flotation and filtering process plant and thickening areas, reagents, fire protection system, laboratories, dressing rooms, warehouses and workshops.
Social rehabilitation center in ChiapasExecutive project of the Minimum and Medium Security Penitentiary Center.
Mayan TrainStructural engineering, monitoring of the on-site geotechnical campaign, geometric design and earthworks for Section 5.