NAICM (Texcoco Airport)
Airside Engineering Project for the Texcoco Airport, which was planned to obtain a LEED certification
Airside Engineering Project for the Texcoco Airport, which was planned to obtain a LEED certification
Technical, Administrative Supervision and Quality Control Services of the Work
Work coordination and administrative control of a PET recycling plant
Engineering project for 9 batteries of concrete silos in a glass plant that supplies bottles for bottling beer from Cervecería Cuauhtémoc Moctezuma.
Engineering and Construction Management
Due diligence, civil engineering and complete construction management for its construction.
Engineering and architectural services for the expansion of the facilities and for the construction of the TEM Building for the manufacture of batteries used for electric vehicles.
Quality control by third parties for use of the mixed complex
Detailed engineering for the electrical, hydraulic and sanitary installations, fire control systems and voice and data routing.
Supervision on lineas 3, 5, 6 and 7 of the Mexico City Public Transportation System.
Independent Engineer.
Independent engineer and quality control
Project Management and Supervision Office of more than 1,200 kilometers of roads.
Supervision of the construction and complementary works of Section 3 of the Elevated Viaduct
Independent engineer service during the manufacturing process of steel pipe and pumping equipment, as well as release in the right of way for installation.
Engineering for the Treatment Plant with average flow capacity of 1,050.00 liters per second.
Engineering for a desalinated seawater production plant for human consumption. 200 lt/sec.
Development of the electrical, mechanical and instrumentation and control engineering project
“Owner engineer” field studies for the largest wind project in Latin America (132 generators)
Engineering and construction assistance for Power Generation Plant II.
Integral Project for the construction of the general hospital in Acapulco with 120 beds.
Development of the integral engineering project under the Green Building standards.
Detailed engineering services for Phase II (OBCE), scope of package No. 6, project in execution, and integral engineering services for the systems through the use of the Smart Plant platform in MEBI and METI models.
Engineering for the Collection and Compression Terminal of the LAKACH field
Supervision and quality control for the expansion of the existing dock in the multi-use cargo terminal.
Direction of the corresponding works, coordination of initiation, execution, completion and approval by the client.
Coordination and Supervision of the works of a project for 2 apartment towers, Oriente A and B Towers
Engineering of the installations for the construction of a mixed-use building.
Supervision of the works consisting of the Executive Project of installations and construction of the architectural superstructure of recovery and expansion.
MEP installation design of 35,000 m2 of construction of areas to be remodeled.
External supervision of the construction
Class V cost estimate for the project of a future gas pipeline of approximately 200 km.
"Cactus" measurement, regulation and control station of the Cuxtal Phase I project, development of dimensional analysis of EMRyC and development of hydraulic model, flexibility analysis, model calibration and development of the hydraulic analysis.
Coordination, preparation of base budget and supervision of the works
Development of engineering for the expansion of 25,000 m2 of an industrial plant that manufactures cosmetic products.
Executive project for the construction of the grinding, flotation and filtering process plant and thickening areas, reagents, fire protection system, laboratories, dressing rooms, warehouses and workshops.
Executive project of the Minimum and Medium Security Penitentiary Center.
Structural engineering, monitoring of the on-site geotechnical campaign, geometric design and earthworks for Section 5.